Wednesday, April 22, 2015

Another Ranch House Update

Jaime tiling Jaime lays tile in the Versailles pattern, a really complex pattern made up of several different sized tiles.
Stella swimming in the front pond. Have I mentioned that Stella loves water? And look! The pond is full. Red entry gates The red gate pops and echoes the red trim on the house and garage.

Jaime figured out how to put down the Versailles pattern on the tile that will continue throughout the downstairs. It’s very intricate, and he has to break it to wrap around the bar, the island, the kitchen wall, and the stairway wall. For each item he breaks around, he has to make the pattern align correctly in the middle of the other side.

Frank has begun laying the bamboo flooring upstairs. He’s starting in the master bedroom and will carry the pattern down the hall to the landing. The stairs will also be clad in bamboo. Suna picked a rich chocolate color.

The crown molding is up. It makes a tremendous difference in how finished the house looks. There was enough left over molding that we ended up with crown in the toilet stall. Fancy!

Suna took advantage of a break in the weather to paint the entry gates red. They look really good now that they match the trim on the house and garage.

 

No comments:

Post a Comment