Villa Park Progress

Slow progress on the foundation Still only slow progress on the foundation.
Working on the footer on the exterior walls by the temporary wall. The exterior walls are still all temporary, but we’re making progress on preparing the footing to receive the permanent ones.
I wish I could get Ruben to clean up. I have too much money in this to fire him mid stream. The site looks good—from a distance. When you get up close, you see what a mess it is.
Brody looks over the back seat. Brody doesn’t like being in the back. He’d rather ride in my lap, but that’s not happening.

Work continues on the Villa Park foundation. The piers are mostly done, and the exterior footings are down. That means we were able to set the building down.

It’s a relief not to have the building floating in the sky—even if we don’t have the “real walls” in place.

 